SGARC

Independence Charter School

Additions and Renovation
Philadelphia, PA

Contruction complete September 2008

Schradergroup After conducting a feasibility study to determine if Independence Charter School could relocate to a vacant school building built in 1910, SGA was retained to provide design services for all necessary additions and renovations. It was determined that the existing 50,000 SF facility would require a 14,000 SF addition to accommodate the existing program. The feasibility study also included programming, cost estimation, zoning review, existing building assessments, master planning and evaluation of historical tax credit eligibility. Design services provided upgrades and modifications to the existing building required for code compliance and include new electrical and HVAC systems. SGA additionally assisted with navigating the project through the Philadelphia zoning approval process. Construction is proceeding utilizing a design/build approach in which SGA and our consultants work directly with representatives of the school and the contractor.

pdf Download full details