SGARC

Lankenau High School

Additions and Renovations
Philadelphia, PA

Completion date to be determined

Schradergroup Lankenau High School is a 57,000 SF facility built in the 1980’s. This project adds 14,000 SF in a new athletic facility and also aims to renovate the structure to match the School District’s current educational standards by enhancing the rather austere existing design. Great care is taken in the site selection of the new athletic facility to avoid disturbing the existing dense tree line surrounding the school and to work best with the steeply inclined and challenging topography. The approach to the project design is exceptionally unique in that it utilizes a full-fledged dynamic community planning process, which directly involves the community, faculty, students, administration, and local design professionals in the brainstorming process and charrette design.

pdf Download full details